CNC turning · milling · sheet metal · Coimbatore, since 2004

Precision parts to your drawing, priced before you ask.

We machine and ship metal parts for pump, automotive and electrical makers in India, the US, the EU and Australia. Pick a part, set the tolerance, and see the price, lead time and free capacity on this page.

Get an instant estimateSee live capacity
Drawing KPW-PS-024 · rev C{{ explodeHint }}
OP10turn Ø18 h6 OP20turn Ø24 ±0.01 OP30groove Ø20 OP40thread M16 163.00 ±0.05 73.30 ±0.03 Ø 24.00 ±0.01 Ø 18 h6 M16×1.5-6g Ra 0.8

Material

SS 304

General tol.

ISO 2768-f

Scale

2:1

Unit

mm

Can you hold my tolerance?±0.01 mm turned Is your quality proven?180 PPM · IATF 16949 Do you have capacity?{{ runningLine }} What will it cost landed?FOB, CIF or DDP Will I know what's happening?Live batch tracking
Pumps & valvesAutomotive tier 2Electrical & EVIrrigationIndustrial motors

Capabilities

Three processes, one roof, one inspection room

Every number below is what we hold in production, not on a test piece.

{{ p.n }}

{{ p.name }}

{{ p.machineCount }} machines · {{ p.models }}
Tolerance{{ p.tol }} Max size{{ p.size }} Finish{{ p.finish }} Materials{{ p.materials }}
{{ p.n }} · {{ p.name }}
{{ p.tol }} · {{ p.size }}

Instant estimate

An indicative price in ten seconds, a firm one in 24 hours

Upload your drawing or pick a sample part. The estimate uses our real price breaks; an engineer confirms it against your drawing.

1 · Drawing
Or pick a sample part
4 · Tightest tolerance on the drawing
5 · Quantity per order
{{ quotePart }}Ex-works Coimbatore

Indicative unit price

{{ priceRange }}

{{ priceNote }}

{{ moqNote }}

Lead time

{{ leadTime }}

MOQ

{{ moq }}

First slot

{{ firstSlot }}

Price per piece by order size

{{ b.q }} pcs{{ b.saving }}
Request a firm quote in 24 hoursBatch total {{ batchTotal }}

Live capacity · week {{ isoWeek }}

What is running now, and when we can start yours

Booked load per process for the next six weeks. A week with 15% or more free is a slot we can promise.

{{ runningDisp }}of {{ total }} machines running
RunningChangeover or idle
ModelRunning
{{ m.model }}{{ m.running }} / {{ m.count }}

{{ c.name }}

Next free slot · week {{ c.next }}
Wk {{ w.wk }}{{ w.freeLabel }}

Shaded height is booked load. Updated every shift from the machine monitoring system.

Factory tour

Follow one shaft from bar stock to container

You can't walk our floor before ordering, so here is the audit route. Each stop shows the machine, what it holds, and the check before the part moves on.

{{ t.n }} · {{ t.stage }}

Holding at this stop

{{ tourTol }}

Stop {{ s.n }}
{{ s.n }} · {{ s.machine }}

{{ s.stage }}

Holds{{ s.tol }}Check{{ s.check }}

Quality proof

Numbers and documents, not adjectives

Rolling twelve-month figures from our QMS. Every lot ships with the report below.

{{ m.disp }}{{ m.u }}

{{ m.l }}

Lot 2641 · sample 07
The shaft on this report · Ø 24.004 measured

Certificates

{{ c.name }}

{{ c.scope }}

View certificate →

Demo company — certificates are illustrative.

Inspection report · {{ report.part }}{{ report.lot }} · {{ report.instrument }} · {{ report.date }}
Lot accepted
#FeatureNominalToleranceMeasuredIn bandResult
{{ r.ref }}{{ r.feat }}{{ r.nom }}{{ r.tol }}{{ r.meas }}
Pass

Export & landed cost

What the part costs at your door

Uses the part and quantity from your estimate above. Freight is our contracted rate; duty is an estimate — check your HS code with your broker.

Ship to
Currency
Freight
Part · {{ quotePartShort }} × {{ qtyFmt }}{{ lc.part }}
Freight · {{ lc.mode }} to {{ lc.port }}{{ lc.freight }}
Import duty · estimate {{ lc.dutyPct }}{{ lc.duty }}
Landed per piece{{ lc.landed }}
Typical local supplier, same part{{ lc.local }}
{{ lc.saving }}{{ lc.savingNote }}Transit {{ lc.days }} days

Incoterms we ship on

TermWe handleYou handle
{{ i.t }}{{ i.us }}{{ i.you }}

Documents with every shipment

{{ d }}

Customer portal · preview

Track your batch without sending an email

Every order gets a page like this. Stages update from the shop floor; documents appear as they are signed off.

{{ order.id }}{{ order.part }} × {{ orderQty }}{{ order.buyer }}In packing

{{ o.s }}

{{ o.d }}
Floor photo · today 11:40

Case studies

What changed for the buyer

Talk to an engineer, not sales

Send the drawing. Get a firm quote in 24 hours.

The person who replies runs the cell that would make your part. If we can't hold a tolerance, we'll say so in the first reply.

Engineers on call

07:00–22:00 IST · that's {{ localHours }} for you

NDA first

We sign yours before you send a drawing.

Book a 20-minute call
Received. An engineer will reply with a firm quote within 24 hours.
Demo by sudbuilds